Home           Products           Company           Contact us     
> Fundamentals of Thermodynamics
> Applied Thermodynamics
> Power Engines and Machines
> Internal Combustion Engines
> Refrigeration and Air Conditioning
> Heating and Ventilation
> Sanitary Systems
Products  |  Thermodynamics, Heating and Sanitary Systems  |  Sanitary Systems  |  ST 320
ST 320 Pipe Cleaning Training Panel Show data sheet (pdf file) Print page
Technical Description
The flushing process is intended to remove contaminants, for example the remnants of solder or sealant from the drinking water pipes. The individual pipe circuits must be flushed from bottom to top. It is possible to observe the flushing action by means of transparent pipe sections. Flushing is performed via two lines that are connected to a cold water supply. Contaminants are introduced into the pipe system through openings with shut-off valves. Original plumbing components are used in the unit.
A supply of water is required for operation.
The training panel can be fitted to the HL 100 Universal Stand for Training Panels.
Learning Objectives / Experiments
· Introducing contaminants into the system
· Limitations of flushing according to technical regulations
Features
Pipe flushing according to DIN 1988 standards
Usage of original plumbing components
Clearly laid out training panel
Dirt can be introduced
Alternative products
VS 131 -- Demo Panel Pipe Cleaning and Maintenance
Specification
[1] Pipe flushing in accordance with DIN 1988
[2] l x w x h: 1900x300x1300mm, approx. 100kg
[3] Cold water connection using hose
[4] Usage of original plumbing components
[5] Contaminants can be introduced into the pipe system via filling openings that can be shut off
[6] Transparent pipe fittings enable optimal observation of the flushing process
[7] Alternative accessories: flushing compressor (not included)
[8] Cold water supply min. 3bar
Technical Data
Automatic mixer: thermostatic battery: recommended flow pressure: 1...5bar, min. flow rate: 5ltr/min, max. water temperature: 80°C, with temperature safety stop
Water mixer
Simulated hot water preparation
Safety fittings: quick-action bleed valve, safety valve on the hot water preparation unit
Pipes: Cu / transparent plastic
2x cold water connection Geka coupling 1”
10x hose connection with quick-action couplings
Dimensions and Weight
l x w x h : 1900 x 300 x 1300 mm
Weight : approx. 100 kg
Connections
Cold water supply min. 3bar
Scope of Delivery
1 training panel, completely assembled, 1 set of connecting hoses, 1 instructions manual
Order Details
066.32000 ST 320 Pipe Cleaning Training Panel
Print
© 2005 G.U.N.T. Gerätebau GmbH